ABOUT THIS PROJECT
PMC was the general contractor for the mechanical and piping refurbishment to the existing 30MW Geothermal Power Plant in Mammoth Lakes, CA. Work includes the assembly and installation of new Air Coolers, Replacement of various existing valves, modification and replacement of existing piping systems, installation of new mechanical equipment and pumps, and the installation of (2) new Turbine Generators.