(18 MW), PMC was the Contractor for the installation of all mechanical, piping, steel, electrical equipment. Construction included the installation of all gathering system piping, Ormat Energy Converter (OEC) equipment and piping, air coolers, gas removal systems, and electrical controls and instrumentation