ABOUT THIS PROJECT
PMC is the Mechanical Contractor for the installation and commissioning of the Recovered Energy Generation System for Ormat Nevada, Inc. at the Kern River Compressor Station. The work at the compressor station includes the installation of an Ormat Energy Converter (OEC), Waste Heat Oil Heaters (WHOH), pipe rack structure, and all piping. Work also includes mechanical installation of the turbine heat recovery diverters, air cooled condenser, and all electrical equipment such as generator, motors, and instrumentation.